
TSMC ups Low-NA EUV to 27–28 units, China rev +20% in 2026, and Samsung yield gains lift ASML 2027 EPS.
Over the past fortnight, the market has consistently revised TSMC’s year-end 2026 3nm capacity estimates upward—from an initial 140k wpm to 160kwpm, and subsequently to 180kwpm—reflecting robust demand for GPGPUs and AI ASICs. Beyond 3nm, 2nm tape-out volume is tracking at 1.5x that of 3nm during the comparable period, underscoring rising customer engagement. Driven by strong demand for AI silicon, larger die sizes, and the migration of HBM base dies to foundry processes, AI applications are rapidly consuming front-end foundry capacity. Current supply chain checks indicate that, underpinned by robust advanced node demand, TSMC’s 2026 Low-NA EUV requirements have been revised upward from 22 units to 27-28 units, with 2027 demand projected at a minimum of 40 units.
Beyond the aforementioned capacity revisions, equipment suppliers possess further potential upside. Our latest industry checks indicate that TSMC plans to increase its advanced node fab construction over the next three years from the originally planned 13 phases to 15–17 phases. This implies a ~15% potential growth upside for current semiconductor equipment demand.

This report is available to subscribers. Sign in or subscribe to read the full analysis.